School Specification 101: plumbing and heating systems in schools
Contents |
[edit] The role of plumbing and heating in schools
Making learning environments safe and comfortable places for students and staff is a top priority for schools up and down the country. Plumbing and heating systems have a key role to play in creating spaces that are conducive to effective teaching and learning; they elevate safety and performance at every point of use.
There are more than 30,000 schools and academies in the UK, providing dedicated learning environments for more than ten million pupils and employment for more than 600,000 teaching staff. For each of these environments to be effective, it is essential for buildings to perform optimally, including their plumbing and heating systems.
Essential to the smooth, safe and efficient running of schools, plumbing and heating systems must withstand high levels of usage every day, as well as perform reliably for years to come to maximise the stretched budgets of individual schools.
To achieve this, specification is key in equipping schools with the systems they and their pupils will need to rely on.
[edit] Optimising systems for health and safety
Health and safety should be a primary consideration. Accommodating users of all ages, schools should be acutely aware of protecting users from risks such as scalding, as well as diseases such as Legionnaires.
To protect people at the point of use, Thermostatic Mixing Valves (TMVs) can be installed at each outlet, ensuring water temperatures do not exceed 46 degrees Celsius and therefore do not pose a scalding risk. To provide adequate performance and meet the required standards, it is essential that schools use TMV2-approved valves, unless the users are likely to be at a higher risk of scalding. Higher risk users could be those with disabilities, or children of nursery age. In these environments, only TMV3-approved valves should be installed.
To protect users over the long-term, valves should also be easy to access, supporting future maintenance and servicing. Along with testing at time of installation, interim testing should take place every six months for TMV3 valves, and every twelve months for TMV2 valves.
Schools generally have larger hot water systems and user demand is constant, so secondary circulating hot water systems are becoming more common to enable instant hot water at the outlets. It is essential to thermally balance this type of system to ensure optimum efficiency from the heat source; unbalanced systems create a host of problems, from inconsistent hot water availability to creating environments for harmful bacteria to grow. Thermal Balancing Valves (TBVs) negate these challenges. Installed at various points across a system, they safely provide a constant and stable supply of hot water and regulate the flow of water in line with temperature.
Aside from risks such as scalding, specifiers should also seek to prevent against backflow, which is when pressure fluctuations move water in the opposite direction and contaminate the supply. Schools are Fluid Category 4 and as such require the installation of Reduced Pressure Zone (RPZ) valves as standard for this.
[edit] Future-proofing systems
Besides safety, the longevity and reliability of plumbing and heating systems is paramount for schools, enabling them to withstand heavy usage and remain functional for years to come. In practice, effective specification helps schools to maximise their budgets and deliver consistent value for all stakeholders.
Along with protecting users from some of the common challenges associated with hot water systems, effective specification also improves ongoing maintenance. Through effective system planning, regular maintenance and servicing gets carried out quickly and accurately, maximising lifespan and performance.
This article appears in the AT Journal issue 150, summer 2024 as 'School Specification 101: plumbing and heating systems in our schools' and was written by Richard Bateman, Product Marketing Manager, RWC.
--CIAT
[edit] Related articles on Designing Buildings
- Baseline designs for schools.
- BIM for mechanical electrical and plumbing drawings.
- Building Bulletin 93: acoustic design of schools.
- Broadmeadows Primary School.
- Building Schools for the Future BSF.
- Building energy management systems BEMS.
- Building management systems.
- Building services.
- CIBSE Case Study Bushbury Hill Primary School.
- Cooling systems for buildings.
- Energy management and building controls.
- Frequently Googled plumbing and electrical problems.
- Heating.
- How BIM can cause needless early stage MEP design concerns.
- HVAC balancing.
- Mechanical ventilation.
- Mechanical, electrical and plumbing MEP.
- MEP BIM and the building lifecycle.
- Pipework.
- Plant room.
- Plumbing.
- Radiator.
- Rising main.
- Thermal comfort.
- Types of building services.
- Types of heating system.
- Ultrasonic pipe testing.
- Valves.
- Water Regulations Advisory Scheme WRAS.
- What is BB101?
Featured articles and news
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.



























